It depends on the stone: roughly 1.3 US tons per cubic yard for clean stone and about 1.9 for crusher run in our table. Here is the chart, both conversion directions and the loose-vs-compacted catch.

Tons per cubic yard by stone

US short tons (2,000 lb) and cubic yards of finished (compacted) volume, from Vulcan Materials’ estimator values for limestone and sand & gravel;3 marked estimates have no producer figure. Metric: kilograms per cubic metre.

MaterialUS tons per cu ydlb per cu ydcu yd per US tonkg per m³
Pea gravel1.322,6460.761,570
Crushed stone, clean (#57, ¾ in)1.32,5920.771,540
River rock (estimate)1.322,6460.761,570
Decomposed granite (estimate)1.533,0510.651,810
Stone dust / screenings1.533,0510.651,810
Crusher run / road base1.863,7260.542,210
Concrete sand (bedding)1.492,9700.671,760

Other rock types change these: Vulcan lists clean coarse aggregate from 1.22 to 1.38 tons per cu yd and crusher run from 1.75 to 2.16 depending on the rock.3 Published tables by other sites round differently or use delivered (moist) weights, so two charts can disagree by 10% or more. Ask your quarry for the figure on its scale ticket and enter it in the calculator; moisture adds weight.

The two conversions

Cubic yards to tons: multiply by the density. 6 cu yd of clean #57 stone at 1.3 tons per cu yd: 6 × 1.3 = 7.8 US tons.

Tons to cubic yards: divide by the density. 12 tons of crusher run at 1.86 tons per cu yd: 12 ÷ 1.86 = 6.45 cu yd of finished (compacted) volume.

US tons vs metric tonnes. A tonne is 1,000 kg, about 2,205 lb: 10% more than a US ton. 1 US ton = 0.9072 tonne.

Loose yards vs finished yards vs tons

Stone with fines (crusher run, screenings, decomposed granite) compacts, so the cubic yards on the truck are more than the cubic yards of the finished layer, but the weight is the same. The calculator therefore works tons from the finished volume and loose yards from the finished volume plus a compaction allowance.

A 20 × 10 ft pad of crusher run, 4 in finished depth, 5% waste, 30% extra loose material for compaction (our judgement; see the methodology page).

  1. Finished volume: 20 × 10 × 4/12 = 66.7 cu ft = 2.47 cu yd
  2. Weight: 2.47 cu yd × 1.05 × 1.86 = 4.82 US tons (4.37 tonnes)
  3. Loose yards to spread: 2.47 × 1.3 × 1.05 = 3.37 cu yd

So the same job is 2.47 cu yd finished, 3.37 cu yd loose and 4.82 tons. If a yard sells by the cubic yard and another by the ton, compare them on the same basis.